Month: May 2020

Norton Lindsey Village Hall

Norton Lindsey Village Hall

CLIENT: Norton Lindsey Village Hall and Playing Fields (Management Committee) STATUS: Completed 4th October 2019 SIZE: 266m2 GROSS CONTRACT SUM: £506,393 BUILDING PRICE £PSM: £1,877 (excluding demolition, site clearance and drainage alterations) ARCHITECTS: Colin Wilcox Architects STRUCTURAL ENGINEERS: Ian Harban Associates www.ianharban.com EPC RATING: A(23) Design The New Village Hall was built to replaced a […]

Heatherwood

Heatherwood

CLIENT; Sally Schreiber & Annie Attwell STATUS; Completed Mar/April 2014 SIZE; 214 sq m (Gross Internal Floor area) PRICE £PSM: £1,954 (excl Demolition, landscaping/RWH and car port, otherwise turnkey) ARCHITECTS; Jerry Tate Associates STRUCTURAL ENGINEERS; Ian Harban Consulting Engineers EPC RATING; A Brief Annie Attwell and Sally Schreiber wanted to have a truly sustainable house. […]

Gamekeepers Lodge

Gamekeepers Lodge

This 150m2 single storey 3 -bedroom Gamekeepers Lodge  is sited on a landed estate near Tewkesbury in Gloucestershire. Building started in late April 2012 and the lodge was completed in September 2012 (on schedule). Brief The project involved the demolition of a steel portal building previously used to rear pheasants and had to be conducted […]

North Oxfordshire Academy

North Oxfordshire Academy

CLIENT; United Learning Trust C/O North Oxfordshire Academy (NOA) STATUS; Completed May 2015 SIZE; 262m2 internal floor area PRICE £PSM: £1,423 (Full Turnkey inc. Airsource, bringing all services to site & hard landscaping) ARCHITECTS; Richard Walker, Walker Graham www.walkergraham.co.uk STRUCTURAL ENGINEERS; Ian Harban Associates www.ianharban.com EPC RATING; A AIR PERMEABILITY: 2.47 m3/h/m2 @50pa Download Drawings […]

Cambridge International School

Cambridge International School

CLIENT: Cambridge International School, Cambridge COMPLETED: 9th October 2015 SIZE: 183.15 m2 GEA TURN-KEY COST: £271,015 ex VAT including design, engineering,links to existing school and all landscaping. DESIGN AND ENGINEERING: Ian Harban Associates Download Drawings Here Brief To replace an existing temporary marquee building with a more permanent assembly and dining facility in an extremely […]

Cambourne Cricket Pavillion

Cambourne Cricket Pavillion

CLIENT; Cambourne Parish Council STATUS; Completed – Occupied April 2016 SIZE; 170m2 QUANTITY SURVEYOR; The Bremner Partnership LLP. www.bremnerpartnership.com ARCHITECT & STRUCTURAL ENGINEERS; Ian Harban Consulting Engineers EPC RATING; A Download Drawings Here The Brief The aim of the project was to provide… “The community with a purpose built cricket pavilion with changing roomsand catering […]

Marsh Gibbon Primary School

Marsh Gibbon Primary School

CLIENT; Marsh Gibbon COE Primary School STATUS; Completed SIZE; 141m2 PRICE £PSM: £1,751 ARCHITECTS; TSH Architects, Oxford STRUCTURAL ENGINEERS; Ian Harban Consulting Engineers, Banbury EPC RATING; Estimated A Download Drawings Here The Brief The aim of the project was to provide… “Marsh Gibbon School with a high quality, thermally efficient, sustainablebuilding. The planning stipulates a […]

Coneygear Park, Huntingdon

Coneygear Park, Huntingdon

CLIENT: Huntingdon Town Council STATUS: Completed January 2020 SIZE: 675m2 BUILDING PRICE: £1,211,625 (excluding all groundworks and external works) BUILDING PRICE £PSM: £1,795 (excluding all groundworks and external works) ARCHITECTS: Richard Walker www.walkergraham.co.uk STRUCTURAL ENGINEERS: Ian Harban Associates www. EPC RATING: A 18 AIR PERMEABILITY: 2.9 m3/(h.m2) @50 Download Drawings Here Design The centre replaces […]